Responsible for the construction, operation and maintenance of the 230 kV transmission line originating at the Santa Maria 3 substation and ending at the Santo ângelo 2 substation, with an approximate length of 158 km, in the state of Rio Grande do Sul.
Responsible for the construction, operation and maintenance of the 500kV transmission line called Jauru - Cuiabá C, with an approximate length of 355km, in the state of Mato Grosso.
Responsible for the construction, operation and maintenance of the 500kV transmission line called Presidente Juscelino - Itabira 5 C2, with an approximate length of 189 km, in the state of Minas Gerais.
After completing a meticulous negotiation process and fulfilling the conditions precedent, Verene Energia S.A., through its subsidiary IEB, concluded the acquisition of Integração Transmissora de Energia S.A. (Intesa), a 500 kV, 695 km power transmission line located between the states of Tocantins and Goiás.
Intesa will be integrated into Verene, strengthening our position in the market
Energy reaches your home through a structured system involving generation plants, transmission lines, distribution networks and much more.
Follow the path of electricity.
To request crossings over any of our Transmission Lines, please send the following information and documents to :
1. Correspondence to our CEO, formalizing the request for a crossing analysis and indicating the name of the enterprise under Verene's concession where the crossing will take place.
2. Name of requester and contact details, such as e-mail and telephone number
3. Detail drawing of the crossing point (DWG and PDF);
4. Memorial description of the crossing;
5. KMZ of the LT route;
6. ART of execution;
7. Project ART;
8. Proof of registration of the concessionaire responsible for the project and the construction company responsible for carrying out the work;
9. Installation License issued by the competent body;
10. Concession Contract with ANEEL;
11. Procedure for crossing under and/or over an energized transmission line;
12. Detailed timetable for the crossing;