SPE Energy Transmission Company
Green Line II SA.

Responsible for the operation and maintenance of the 500 kV Presidente Juscelino – Itabira 5 C2 transmission line, located in the state of Minas Gerais.

160 km

Extension

500 kV

Operating voltage

49 mm

Allowed Annual Revenue (Cycle 25/26)

August 2022

Entry date
in commercial operation

SPE Santa Lúcia
Energy Transmission Company SA.

Responsible for the operation and maintenance of the 500 kV Jauru – Cuiabá C2 transmission line, located in the state of Mato Grosso.

355 km

Extension

500 kV

Operating voltage

103 mm

Allowed Annual Revenue (Cycle 25/26)

April 2019

Entry date
in commercial operation

SPE Santa Maria
Energy Transmission Company SA.

Responsible for the operation and maintenance of the 230 kV transmission line Santa Maria 3 – Santo Ângelo 2, located in the state of Rio Grande do Sul.

160 km

Extension

230 kV

Operating voltage

32 mm

Allowed Annual Revenue (Cycle 25/26)

October 2018

Entry date
in commercial operation

Transmission Integration
Energy SA (Intesa)

Responsible for the operation and maintenance of the 500 kV Colinas – Miracema, Miracema – Gurupi, Gurupi – Peixe 2, and Peixes 2 – Serra da Mesa 2 transmission lines, and the Peixe 2 and Serra da Mesa 2 substations, located between the states of Tocantins and Goiás.

695 km

Extension

500 kV

Operating voltage

124 mm

Allowed Annual Revenue (Cycle 25/26)

May 2008

Entry date
in commercial operation

SPE Transmission Company
Green Line Energy I SA.

Responsible for the operation and maintenance of the 500 kV transmission line Governador Valadares 6 – Mutum, located in the state of Minas Gerais.

153 km

Extension

500 kV

Operating voltage

48 mm

Allowed Annual Revenue (Cycle 25/26)

January 2024

Entry date
in commercial operation

Belém Transmission Company
Energy SA.

Responsible for the operation and maintenance of the 500 kV Vila do Conde – Marituba C1 transmission line, the 230 kV Marituba – Castanhal C1 transmission line, and the Marituba substation, located in the state of Pará.

124 km

Extension

230/500 kV

Operating voltage

143 mm

Allowed Annual Revenue (Cycle 25/26)

December 2020

Start of operation

Transmission Barriers
Energy SA.

Responsible for the operation and maintenance of the 500 kV transmission line SE Barreiras II – SE Rio da Éguas C2, located in the state of Bahia.

251 km

Extension

500 kV

Operating voltage

114 mm

Allowed Annual Revenue (Cycle 25/26)

May 2020

Start of operation

Buritirama Transmission
Energy SA.

Responsible for the operation and maintenance of the 500 kV transmission line between Barreiras II and Buritirama C1 substations, located in the state of Bahia.

209 km

Extension

500 kV

Operating voltage

102 mm

Allowed Annual Revenue (Cycle 25/26)

January 2020

Start of operation

Vale do Sertão
Energy Transmission Company SA.

Responsible for the operation and maintenance of the 500 kV transmission line SE Buritirama – SE Queimada Nova II C2, located in the states of Bahia and Piauí.

372 km

Extension

500 kV

Voltage

149 mm

Allowed Annual Revenue (Cycle 25/26)

May 2021

Start of operation

Jaíba Energy Transmission Company SA.

Responsible for the operation and maintenance of the 500 kV transmission line SE Barreiras II – SE Rio da Éguas C2, located in the state of Bahia.

589 km

Extension

500 kV

Voltage

268 mm

Allowed Annual Revenue (Cycle 25/26)

October 2020

Start of operation

Alto Sertão
Energy Transmission Company SA.

Responsible for the operation and maintenance of the 500 kV transmission line SE Barreiras II – SE Rio da Éguas C2, located in the state of Bahia.

249 km

Extension

500 kV

Voltage

124 mm

Allowed Annual Revenue (Cycle 25/26)

January 2021

Start of operation

Presidente Juscelino
Energy Transmission Company SA.

Responsible for the operation and maintenance of the 500 kV transmission line SE Janaúba 3 – SE Presidente Juscelino – C2, located in the state of Bahia.

326 km

Extension

500 kV

Voltage

154 mm

Allowed Annual Revenue (Cycle 25/26)

March 2021

Start of operation

Tapajós Energy Transmission Company SA.

Responsible for the operation and maintenance of the 230 kV transmission lines SE Xingu – SE Altamira C1, SE Altamira – SE Transamazônica C2, SE Transamazônica – Tapajós C1 and SE Tapajós, located in the state of Pará.

430 km

Extension

230/138 kV

Voltage

193 mm

Allowed Annual Revenue (Cycle 25/26)

September 2019

Start of operation