The exponents
of the sector
electric
Brazilian

In the sector
electric,
a new era
is yet to come

SPE Energy Transmission Company
Green Line II SA.

Responsible for the operation and maintenance of the 500 kV Presidente Juscelino – Itabira 5 C2 transmission line, located in the state of Minas Gerais.

160 km

Extension

500 kV

Operating voltage

49 mm

Allowed Annual Revenue (Cycle 25/26)

August 2022

Entry date
in commercial operation

SPE Santa Lúcia
Energy Transmission Company SA.

Responsible for the operation and maintenance of the 500 kV Jauru – Cuiabá C2 transmission line, located in the state of Mato Grosso.

355 km

Extension

500 kV

Operating voltage

103 mm

Allowed Annual Revenue (Cycle 25/26)

April 2019

Entry date
in commercial operation

SPE Santa Maria
Energy Transmission Company SA.

Responsible for the operation and maintenance of the 230 kV transmission line Santa Maria 3 – Santo Ângelo 2, located in the state of Rio Grande do Sul.

160 km

Extension

230 kV

Operating voltage

32 mm

Allowed Annual Revenue (Cycle 25/26)

October 2018

Entry date
in commercial operation

Transmission Integration
Energy SA (Intesa)

Responsible for the operation and maintenance of the 500 kV Colinas – Miracema, Miracema – Gurupi, Gurupi – Peixe 2, and Peixes 2 – Serra da Mesa 2 transmission lines, and the Peixe 2 and Serra da Mesa 2 substations, located between the states of Tocantins and Goiás.

695 km

Extension

500 kV

Operating voltage

124 mm

Allowed Annual Revenue (Cycle 25/26)

May 2008

Entry date
in commercial operation

SPE Transmission Company
Green Line Energy I SA.

Responsible for the operation and maintenance of the 500 kV transmission line Governador Valadares 6 – Mutum, located in the state of Minas Gerais.

153 km

Extension

500 kV

Operating voltage

48 mm

Allowed Annual Revenue (Cycle 25/26)

January 2024

Entry date
in commercial operation

Belém Transmission Company
Energy SA.

Responsible for the operation and maintenance of the 500 kV Vila do Conde – Marituba C1 transmission line, the 230 kV Marituba – Castanhal C1 transmission line, and the Marituba substation, located in the state of Pará.

124 km

Extension

230/500 kV

Operating voltage

143 mm

Allowed Annual Revenue (Cycle 25/26)

December 2020

Start of operation

Transmission Barriers
Energy SA.

Responsible for the operation and maintenance of the 500 kV transmission line SE Barreiras II – SE Rio da Éguas C2, located in the state of Bahia.

251 km

Extension

500 kV

Operating voltage

114 mm

Allowed Annual Revenue (Cycle 25/26)

Maio 2020

Start of operation

Buritirama Transmission
Energy SA.

Responsável pela operação e manutenção da LT 500 kV SE Barreiras II – SE Buritirama C1, localizada no estado da Bahia.

209 km

Extension

500 kV

Operating voltage

102 mm

Allowed Annual Revenue (Cycle 25/26)

January 2020

Start of operation

Vale do Sertão
Energy Transmission Company SA.

Responsável pela operação e manutenção da LT 500 kV SE Buritirama – SE Queimada Nova II C2, localizada no estado da Bahia e Piauí.

372 km

Extension

500 kV

Voltage

149 mm

Allowed Annual Revenue (Cycle 25/26)

May 2021

Start of operation

Jaíba Energy Transmission Company SA.

Responsible for the operation and maintenance of the 500 kV transmission line SE Barreiras II – SE Rio da Éguas C2, located in the state of Bahia.

589 km

Extension

500 kV

Voltage

268 mm

Allowed Annual Revenue (Cycle 25/26)

October 2020

Start of operation

Alto Sertão
Energy Transmission Company SA.

Responsible for the operation and maintenance of the 500 kV transmission line SE Barreiras II – SE Rio da Éguas C2, located in the state of Bahia.

249 km

Extension

500 kV

Voltage

124 mm

Allowed Annual Revenue (Cycle 25/26)

January 2021

Start of operation

Presidente Juscelino
Energy Transmission Company SA.

Responsible for the operation and maintenance of the 500 kV transmission line SE Janaúba 3 – SE Presidente Juscelino – C2, located in the state of Bahia.

326 km

Extension

500 kV

Voltage

154 mm

Allowed Annual Revenue (Cycle 25/26)

March 2021

Start of operation

Tapajós Energy Transmission Company SA.

Responsible for the operation and maintenance of the 230 kV transmission lines SE Xingu – SE Altamira C1, SE Altamira – SE Transamazônica C2, SE Transamazônica – Tapajós C1 and SE Tapajós, located in the state of Pará.

430 km

Extension

230/138 kV

Voltage

193 mm

Allowed Annual Revenue (Cycle 25/26)

September 2019

Start of operation

Enter your ONS code below for consultation: